While the bathroom on the second floor is nearing completion (we still need that super expensive glass door that's not in the budget) the first floor toilet is under construction. Since they look identical, I thought a juxtaposition of before and after might work nicely here.
The demo on the first floor was considerably less than the second floor. We will only be replacing the lower walls, tiles and moving the tub back where it was under the window. A new toilet and sink will eventually be installed.
![]() |
| Hex tiles on the floor, subway in the shower surround and a pre cast shower pan to match. |
![]() |
| Trent hand-crafted this drug cabinet. |
![]() |
| The finished product. It's fairly awesome. |


.jpg)










.jpg)
.jpg)






